logo

Eleventh Street Bridge Project

Sector: Bridge • Location: Washington, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

The Eleventh Street Bridge Project replaced the existing twin bridges that carry I-295 over the Anacostia River in the southeast quadrant of the District of Columbia. Three new bridges were constructed and improvements were made to the interchanges at both ends, including adding missing movements to and from the north onto the Anacostia Freeway (I-295/DC 295). The two-phase pr

Project Information FAQ

Project Information

5 Q
The project “Eleventh Street Bridge Project” is an infrastructure initiative in the Bridge sector, located in Washington, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Eleventh Street Bridge Project replaced the existing twin bridges that carry I-295 over the Anacostia River in the southeast quadrant of the District of Columbia. Three new bridges were constructed and improvements were made to the interchanges at both ends, including adding missing movements to and from the north onto the Anacostia Freeway (I-295/DC 295). The two-phase project has: Improved mobility by providing separate freeway and local traffic connections to both directions of DC 295, the Southeast-Southwest Freeway (I-295/I-395), and local streets on both sides of the river Provided a shared bicycle and pedestrian path, as well as rails to allow future streetcar connections Replaced functionally deficient and structurally obsolete bridges Provided additional evacuation routes from the nation's capital Included new trail connections, improved drainage, and other environmental investments Phase 1 included the three bridges and most of the amenities described above. Phase 2 further improved the connection between the Southeast-Southwest Freeway and Virginia Ave. SE with the new outbound 11th Street Freeway Bridge.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data