Eleventh Street Bridge Project
Sector: Bridge • Location: Washington, United States of America
Source: Federal Highway Administration (FHWA)
The Eleventh Street Bridge Project replaced the existing twin bridges that carry I-295 over the Anacostia River in the southeast quadrant of the District of Columbia. Three new bridges were constructed and improvements were made to the interchanges at both ends, including adding missing movements to and from the north onto the Anacostia Freeway (I-295/DC 295). The two-phase pr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Eleventh Street Bridge Project replaced the existing twin bridges that carry I-295 over the Anacostia River in the southeast quadrant of the District of Columbia. Three new bridges were constructed and improvements were made to the interchanges at both ends, including adding missing movements to and from the north onto the Anacostia Freeway (I-295/DC 295). The two-phase project has: Improved mobility by providing separate freeway and local traffic connections to both directions of DC 295, the Southeast-Southwest Freeway (I-295/I-395), and local streets on both sides of the river Provided a shared bicycle and pedestrian path, as well as rails to allow future streetcar connections Replaced functionally deficient and structurally obsolete bridges Provided additional evacuation routes from the nation's capital Included new trail connections, improved drainage, and other environmental investments Phase 1 included the three bridges and most of the amenities described above. Phase 2 further improved the connection between the Southeast-Southwest Freeway and Virginia Ave. SE with the new outbound 11th Street Freeway Bridge. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
