Elgeti Water Treatment Plant Energy Efficiency Upgrades for Heating, Insulation and Lighting Systems
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
Switch to high efficiency electrical or natural gas heaters. Interlock heaters with fresh air vents to disable when generator is running to reduce heat loss. Install rooftop, wall and pipe insulation to reduce heat loss. Replace existing lighting with high efficiency lighting (LED). Install motion and occupancy sensors in appropriate areas.
- Status
- Closed
- Sector
- Water Supply and Storage, Natural Gas, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Elgeti Water Treatment Plant Energy Efficiency Upgrades for Heating, Insulation and Lighting Systems
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Switch to high efficiency electrical or natural gas heaters. Interlock heaters with fresh air vents to disable when generator is running to reduce heat loss. Install rooftop, wall and pipe insulation to reduce heat loss. Replace existing lighting with high efficiency lighting (LED). Install motion and occupancy sensors in appropriate areas. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Natural Gas, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
