Elgin ISD New Middle School #2
Sector: Raw Materials • Location: Elgin, Texas, United States of America
Source: Dodge
ground-up construction of a state-of-the-art facility designed to serve up to 1,200 students. The files provided are the 75% CD documents package that will be Bid for GMP01 scope items ONLY. The GMP01 scope items consist of building concrete, site concrete, structural steel fabrication & erection, earthwork, erosion control, and site utilities. The site is located at 2005 FM 1704, approximately 3
- Status
- Prospective
- Sector
- Raw Materials, Road, Manufacturing (Industrial), Cement, Education, Power Transmission, Power Generation (CCGT), Steel, Metal, Government, Commercial
- Location
- Elgin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Elgin ISD New Middle School #2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | sub bidding, start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ground-up construction of a state-of-the-art facility designed to serve up to 1,200 students. The files provided are the 75% CD documents package that will be Bid for GMP01 scope items ONLY. The GMP01 scope items consist of building concrete, site concrete, structural steel fabrication & erection, earthwork, erosion control, and site utilities. The site is located at 2005 FM 1704, approximately 3 miles from Highway 290. Formerly agricultural land, the property features meadows, wooded areas, ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Elgin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Road, Manufacturing (Industrial), Cement, Education, Power Transmission, Power Generation (CCGT), Steel, Metal, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
