Elgin Street, Rhodes Court and Calvin Street Sewage Pumping Station Rehabilitation
In progress · Ontario
Source: Infrastructure Canada
Elgin Street, (FC001) - replace both sewage pumps each rated at 5 L/s and select process piping. Replace electrical disconnect switches, stand-by electrical generator control switch and process controller. Replace or rehabilitate access hatches and access ladders. Replace process control sensors and wiring. Inspect condition of discharge forcemain. Resurface access roadway to increase lifespan of
- Status
- Under Construction
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Power Generation (CCGT), Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Elgin Street, Rhodes Court and Calvin Street Sewage Pumping Station Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Elgin Street, (FC001) - replace both sewage pumps each rated at 5 L/s and select process piping. Replace electrical disconnect switches, stand-by electrical generator control switch and process controller. Replace or rehabilitate access hatches and access ladders. Replace process control sensors and wiring. Inspect condition of discharge forcemain. Resurface access roadway to increase lifespan of asset. This project affects a population of approximately 200. Rhodes Crt (DC009) - rehabilitate two pumps and motors each rated at 16 L/s. Replace stand-by electrical generator control switch. Replace or rehabilitate access hatches and access ladders. Replace process control sensors and wiring. Inspect condition of discharge forcemain. Resurface access roadway to increase lifespan of asset. This project affects a population of approximately 150. Calvin St (HC011) - rehabilitate two pumps each with a rated capacity of 82 L/s and motor control centre. Replace stand-by electrical generator and controls, electrical transformer, electrical distribution panel and exterior lighting. Replace process control sensors and wiring. Replace building heating and ventilation equipment. Inspect condition of discharge forcemain. Resurface access roadway to increase lifespan of asset. This project affects a population of approximately 2700. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Power Generation (CCGT), Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
