logo
ProjectOngoing

Elimination of bottlenecks on railway line Ljubljana–Divača

Ongoing · Slovenia

Source: EU Funding & Tenders Portal

The project addresses the upgrade of the railway infrastructure at three railway stations (Brezovica, Vnanje Gorice, Preserje), as well as the construction of two power substations in Borovnica and Postojna, and an underpass in Postojna. The project is part of Global Project covering the upgrade of the railway line Ljubljana-Divača located on the Baltic-Adriatic and the Mediterranean Core Network

Status
Under Construction
Sector
Tunnel, Mass Transit, Rail, Power Generation (CCGT), Government
Location
Slovenia
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Elimination of bottlenecks on railway line Ljubljana–Divača

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Elimination of bottlenecks on railway line Ljubljana–Divača” is an infrastructure initiative in the Tunnel sector, located in Slovenia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Sponsoring Agency

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project addresses the upgrade of the railway infrastructure at three railway stations (Brezovica, Vnanje Gorice, Preserje), as well as the construction of two power substations in Borovnica and Postojna, and an underpass in Postojna. The project is part of Global Project covering the upgrade of the railway line Ljubljana-Divača located on the Baltic-Adriatic and the Mediterranean Core Network Corridors. With the ongoing growth of traffic, the railway line is becoming increasingly saturated, and with the opening of the new 2nd track between Divača and Koper, a significant increase in freight transport on the entire Divača-Ljubljana section can be expected. Interventions for upgrading the infrastructure to TEN-T core network requirements are therefore necessary. The main objective of the project is to improve the technical parameters of the railway infrastructure, namely: • speed of freight trains 100 km/h • maximum possible length of trains of 740 m • axle load of at least 22.5 t • increasing the throughput and transport capacity of the railway line • increasing the level of traffic safety • improving reliability of electricity supply • ensuring interoperability and compliance with the TSI requirements The implementation of the project and achievement of the above objectives will contribute to improvements in terms of capacity, safety, performance and efficiency of the railway line, which will also have positive socio-economic effects and impacts on environment.

Location

Country

Slovenia

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Tunnel, Mass Transit, Rail, Power Generation (CCGT), Government

Article published date

2025-10-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project