Eliot River Elementary Building Phase 1
Sector: Water Supply and Storage • Location: Prince Edward Island, Canada
Source: Infrastructure Canada
This project is consists of infrastructure improvements to Eliot River Elementary School. Interior renovations will replace end-of-life mechanical and electrical equipment that is original to the building. This work includes replacement of expansion tanks, hot water tank, domestic hot water mixing valve, various pumps, piping, electrical panels and new LED lighting. This interior renovation work w
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government
- Location
- Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Eliot River Elementary Building Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is consists of infrastructure improvements to Eliot River Elementary School. Interior renovations will replace end-of-life mechanical and electrical equipment that is original to the building. This work includes replacement of expansion tanks, hot water tank, domestic hot water mixing valve, various pumps, piping, electrical panels and new LED lighting. This interior renovation work will focus on approximately approximately 2,500 ft2 of mechanical and gym change room space that will be completely reconstructed. Additionally, two new accessible washrooms will be built within the existing classroom area. An exterior building envelope package will see a new modified bitumen roof on Eliot River Elementary School that will be designed in-line with the National Energy Code of Canada for Buildings (NECB) 2017. Additionally, the aging exterior brick will be selectively repointed to ensure building envelope integrity. The roof area is approximately 35,000 ft2 and the repointing is estimated at 4,000 ft2. The province has committed to a life cycle renewal infrastructure investment in the Eliot River Elementary school to address aging infrastructure, life safety systems, energy efficiency initiatives, and provide additional instructional and administration space. |
Original sector | Community, Culture and Recreation |
Location
Country | Canada |
State | Prince Edward Island |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
