Elizabeth Ave Shared Use Path
Sector: Road • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
The construction of Elizabeth Avenue Shared-Use Path consists of upgrading the existing sidewalk on the North side of the street from Allandale Road to Paton Street to create a continuous 1.3 km active transportation route comfortable for use by people of all ages and abilities. The project supports transportation equity by filling gaps in current public transit coverage and connecting neighbourho
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The construction of Elizabeth Avenue Shared-Use Path consists of upgrading the existing sidewalk on the North side of the street from Allandale Road to Paton Street to create a continuous 1.3 km active transportation route comfortable for use by people of all ages and abilities. The project supports transportation equity by filling gaps in current public transit coverage and connecting neighbourhoods and essential destinations with a shared-use path that will attract people of all ages and abilities to walk, stroll, roll or cycle. The route alignment is part of the Bike St. John’s Master Plan and recognizes previous MUN Area Traffic Studies and Campus Master Plans. The existing sidewalk will be replaced with an asphalt surface widened to 3.0 metres. The entire section will be adjacent to the street corridor. The scope of the construction work includes removing existing sidewalk and curb/gutter, minor excavation and grubbing, construction of some small retaining structures, installation of curb and gutter and trail surface, asphalt reinstatement and finished landscaping. Street crossings and intersections will be upgraded to create a continuous and comfortable route. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
