Elizabeth Ave Shared Use Path
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The construction of Elizabeth Avenue Shared-Use Path consists of upgrading the existing sidewalk on the North side of the street from Allandale Road to Paton Street to create a continuous 1.3 km active transportation route comfortable for use by people of all ages and abilities. The project supports transportation equity by filling gaps in current public transit coverage and connecting neighbourho
- Status
- Under Construction
- Sector
- Road, Car parking, Government, Automotive
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Elizabeth Ave Shared Use Path
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The construction of Elizabeth Avenue Shared-Use Path consists of upgrading the existing sidewalk on the North side of the street from Allandale Road to Paton Street to create a continuous 1.3 km active transportation route comfortable for use by people of all ages and abilities. The project supports transportation equity by filling gaps in current public transit coverage and connecting neighbourhoods and essential destinations with a shared-use path that will attract people of all ages and abilities to walk, stroll, roll or cycle. The route alignment is part of the Bike St. John’s Master Plan and recognizes previous MUN Area Traffic Studies and Campus Master Plans. The existing sidewalk will be replaced with an asphalt surface widened to 3.0 metres. The entire section will be adjacent to the street corridor. The scope of the construction work includes removing existing sidewalk and curb/gutter, minor excavation and grubbing, construction of some small retaining structures, installation of curb and gutter and trail surface, asphalt reinstatement and finished landscaping. Street crossings and intersections will be upgraded to create a continuous and comfortable route. |
Original sector | Active Transportation |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Road, Car parking, Government, Automotive |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
