logo

Elizabeth Ave Shared Use Path

Sector: Car parking • Location: Newfoundland and Labrador, Canada

Source: Infrastructure Canada

Project
In Progress

The construction of Elizabeth Avenue Shared-Use Path consists of upgrading the existing sidewalk on the North side of the street from Allandale Road to Paton Street to create a continuous 1.3 km active transportation route comfortable for use by people of all ages and abilities. The project supports transportation equity by filling gaps in current public transit coverage and connecting neighbourho

Project Information FAQ

Project Information

3 Q
The project “Elizabeth Ave Shared Use Path” is an infrastructure initiative in the Car parking sector, located in Newfoundland and Labrador, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The construction of Elizabeth Avenue Shared-Use Path consists of upgrading the existing sidewalk on the North side of the street from Allandale Road to Paton Street to create a continuous 1.3 km active transportation route comfortable for use by people of all ages and abilities. The project supports transportation equity by filling gaps in current public transit coverage and connecting neighbourhoods and essential destinations with a shared-use path that will attract people of all ages and abilities to walk, stroll, roll or cycle. The route alignment is part of the Bike St. John’s Master Plan and recognizes previous MUN Area Traffic Studies and Campus Master Plans. The existing sidewalk will be replaced with an asphalt surface widened to 3.0 metres. The entire section will be adjacent to the street corridor. The scope of the construction work includes removing existing sidewalk and curb/gutter, minor excavation and grubbing, construction of some small retaining structures, installation of curb and gutter and trail surface, asphalt reinstatement and finished landscaping. Street crossings and intersections will be upgraded to create a continuous and comfortable route.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data