Elizabeth River Trail - Phase IV
One of 10,000+ projects Taiyo tracks in New Jersey.
Source: Dodge USA
The project generally consists of the construction of a 10-foot wide shared use path, construction of cast in place concrete retaining walls, replacement of the existing metal railing on the existing bulkhead, installation of rectangular rapid flash beacons, public sidewalk curb ramps, signs, striping, lighting, landscaping and restoration.
- Status
- Closed
- Sector
- Metal, Cement, Rail, Car parking, Government, Road, Automotive, Commercial
- Location
- Elizabeth, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Elizabeth River Trail - Phase IV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project generally consists of the construction of a 10-foot wide shared use path, construction of cast in place concrete retaining walls, replacement of the existing metal railing on the existing bulkhead, installation of rectangular rapid flash beacons, public sidewalk curb ramps, signs, striping, lighting, landscaping and restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Elizabeth |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Rail, Car parking, Government, Road, Automotive, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
