Elizabeth River Tunnels (Downtown / Midtown Tunnel)
Sector: Commercial • Location: Virginia, United States of America
Source: Federal Highway Administration (FHWA)
The Elizabeth River Tunnels (Downtown / Midtown Tunnel) project consists of five construction components involving three facilities in the Hampton Roads region of Virginia. Collectively, the project is known as the Elizabeth River Tunnels. The Midtown Tunnel portion consists of a new two-lane tolled tunnel under the Elizabeth River parallel to the existing Midtown Tunnel connecting the Cities of N
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Elizabeth River Tunnels (Downtown / Midtown Tunnel) project consists of five construction components involving three facilities in the Hampton Roads region of Virginia. Collectively, the project is known as the Elizabeth River Tunnels. The Midtown Tunnel portion consists of a new two-lane tolled tunnel under the Elizabeth River parallel to the existing Midtown Tunnel connecting the Cities of Norfolk and Portsmouth as well as modifications to the existing tunnel to provide increased capacity for east-west travel linking U.S. Route 58 and I-264 in Portsmouth to the interchange at Brambleton Avenue/Hampton Boulevard in Norfolk. Modifications to the interchange were also made. The planned improvements to the Downtown Tunnel have brought it into compliance with current fire and life safety standards. The MLK Extension portion of the project consists of an extension of Route 58 south from London Boulevard, approximately 0.8 mile to I-264 with an interchange at High Street. The $2.1 billion project has been delivered on a design, build, finance, operate, and maintain (DBFOM) concession basis by Elizabeth River Crossings Opco, LLC (ERC) composed of Skanska Infrastructure Development and Macquarie Group. ERC is operating the concession for 58 years. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
