Elk Point Structure Replacement and Approach Grading
Bidding · South Dakota · Last reported Aug 2025
Source: Dodge
The Project includes the following work: Unclassified Excavation Installation of 4 - 14 x 11 Precast Concrete Box Culvert The work on the proposed improvements.
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Waste Processing and Treatment, Commercial
- Location
- Elk Point, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Elk Point Structure Replacement and Approach Grading
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following work: Unclassified Excavation Installation of 4 - 14 x 11 Precast Concrete Box Culvert The work on the proposed improvements. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Elk Point |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
