Elk Ridge Pedestrian Bridge Erosion Maintenance
Sector: Commercial • Location: Omaha, Nebraska, United States of America
Source: Dodge USA
Stabilize eroded areas under pedestrian bridge and establish slope stabilization along the drainageway in Outlot 3 within the boundary of the referenced District. The work shall include small diameter storm sewer, concrete paving removal and replacement, retaining wall construction and seeding and erosion control measures.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Stabilize eroded areas under pedestrian bridge and establish slope stabilization along the drainageway in Outlot 3 within the boundary of the referenced District. The work shall include small diameter storm sewer, concrete paving removal and replacement, retaining wall construction and seeding and erosion control measures. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
