Ellis Avenue Mixed Use
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
Demolish the existing liquor store and part of the carwash and construct a four-story mixed-use development (48 condominium units and 891 sq. ft. of street level retail) with three levels of subterranean parking on a 0.955 acre site
- Status
- Prospective
- Sector
- Consumer Products, Commercial, Road, Manufacturing (Industrial), Car parking, Residential, Automotive
- Location
- Huntington Beach, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ellis Avenue Mixed Use
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Demolish the existing liquor store and part of the carwash and construct a four-story mixed-use development (48 condominium units and 891 sq. ft. of street level retail) with three levels of subterranean parking on a 0.955 acre site |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Huntington Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Commercial, Road, Manufacturing (Industrial), Car parking, Residential, Automotive |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
