Ellis Creek Subdivision Paving Improvements
Sector: Road • Location: Weatherford, Texas, United States of America
Source: Dodge USA
This project includes the reconstruction of approximately 0.93 miles of existing 2-lane rural asphalt roads and fog seal of approximately 1.8 miles of existing 2-lane rural asphalt roads. This project also includes the replacement of a double barrel 24 diameter culvert (CMP) with double barrel 24 diameter reinforced concrete pipe (CL V) culvert. The reconstruction work will consist of blending cem
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial
- Location
- Weatherford, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ellis Creek Subdivision Paving Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the reconstruction of approximately 0.93 miles of existing 2-lane rural asphalt roads and fog seal of approximately 1.8 miles of existing 2-lane rural asphalt roads. This project also includes the replacement of a double barrel 24 diameter culvert (CMP) with double barrel 24 diameter reinforced concrete pipe (CL V) culvert. The reconstruction work will consist of blending cement with the existing asphalt road and base to a depth of 11 , then removal of the top 3 of cemen... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Weatherford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
