Ellwood Remelt Steel Expansion
Planning schematics · Pennsylvania · Last reported Apr 2025
Source: Dodge
Land Development Plan of Ellwood Remelt Steel to construct a 95,000 square foot vacuum induction melting facility at the former A-Space property located off of Furnace Street. The proposed construction will include the partial demolition of the existing ASpace building on site. The property is located generally in the area of 700 Moravia Street
- Status
- Prospective
- Sector
- Steel, Commercial, Manufacturing (Industrial), Road, Residential, Metal
- Location
- New Castle, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Ellwood Remelt Steel Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Land Development Plan of Ellwood Remelt Steel to construct a 95,000 square foot vacuum induction melting facility at the former A-Space property located off of Furnace Street. The proposed construction will include the partial demolition of the existing ASpace building on site. The property is located generally in the area of 700 Moravia Street |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | New Castle |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Commercial, Manufacturing (Industrial), Road, Residential, Metal |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
