Elm Grove Elementary School Bus Loop
One of 10,000+ projects Taiyo tracks in Louisiana.
Source: Dodge
This report presents the results of the geotechnical exploration performed for a proposed school bus loop and parking area pavement addition at Elm Grove Elementary School in Bossier Parish, Louisiana. The site is located at 1541 Old Highway 71. The proposed bus loop and pavement addition are to be constructed in an open field area between the existing school buildings and Louisiana Highway 154. T
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road, Car parking, Education, Automotive, Commercial, Government, Manufacturing (Industrial)
- Location
- Elm Grove, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Elm Grove Elementary School Bus Loop
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This report presents the results of the geotechnical exploration performed for a proposed school bus loop and parking area pavement addition at Elm Grove Elementary School in Bossier Parish, Louisiana. The site is located at 1541 Old Highway 71. The proposed bus loop and pavement addition are to be constructed in an open field area between the existing school buildings and Louisiana Highway 154. The proposed bus loop will extend from LA-154 to the south on the eastern side of the property to ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Elm Grove |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road, Car parking, Education, Automotive, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
