Elm Street & West Street Water Main Lining
Sector: Water Supply and Storage • Location: Leominster, Massachusetts, United States of America
Source: Dodge USA
The Work includes the following major items: a. Elm Street (Base Bid) - Cleaning and cured-in-place (CIPP) lining of approximately 2,000 linear feet of 12-inch cast iron water main on Elm Street, between Pond Street and Birch Street. b. Providing a temporary potable water bypass system to maintain service to all property owners affected by the water main shutdown during the proposed cleaning and l
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Metal, Steel, Government, Waste Processing and Treatment, Commercial
- Location
- Leominster, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Elm Street & West Street Water Main Lining
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work includes the following major items: a. Elm Street (Base Bid) - Cleaning and cured-in-place (CIPP) lining of approximately 2,000 linear feet of 12-inch cast iron water main on Elm Street, between Pond Street and Birch Street. b. Providing a temporary potable water bypass system to maintain service to all property owners affected by the water main shutdown during the proposed cleaning and lining. c. Replacing hydrant laterals, gate valves, pipe, and fittings as required. d. Paving repa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Leominster |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Metal, Steel, Government, Waste Processing and Treatment, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
