Elm Street 3 Culverts Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Three large culverts on Vermont Route 12 failed during the July 2023 event resulting in the road being overtopped and damaged. Each has had preliminary design work completed. Finch road culvert (2000 Elm Street) will replace the existing 7.75' w X 6' h box culvert with a new box culvert that is twice the size (15' w x 6' h). New wing walls and rip rap along Finch Road will secure the unnamed strea
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Government
- Location
- Montpelier, Vermont, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Elm Street 3 Culverts Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Three large culverts on Vermont Route 12 failed during the July 2023 event resulting in the road being overtopped and damaged. Each has had preliminary design work completed. Finch road culvert (2000 Elm Street) will replace the existing 7.75' w X 6' h box culvert with a new box culvert that is twice the size (15' w x 6' h). New wing walls and rip rap along Finch Road will secure the unnamed stream. There will be a removal of 2900 cubic yards of material upstream to increase flood capacity. S... |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | Montpelier |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION