Elmhurst Ave. Over Bushkill Creek Culvert Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project is for the Replacement of the Elmhurst Avenue Culvert over Bushkill Creek in the Town of Newburgh, Orange, New York. The Contractor s responsibilities include: 1. Demolition and Disposal of the Existing Culvert. 2. Reconstruction of the roadway approaches to the limits shown on the contract drawings. 3. Construction of a new Culvert to include (but not limited to): a. Installation of
- Status
- Prospective
- Sector
- Consumer Products, Cement, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial
- Location
- Orange Lake, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Elmhurst Ave. Over Bushkill Creek Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is for the Replacement of the Elmhurst Avenue Culvert over Bushkill Creek in the Town of Newburgh, Orange, New York. The Contractor s responsibilities include: 1. Demolition and Disposal of the Existing Culvert. 2. Reconstruction of the roadway approaches to the limits shown on the contract drawings. 3. Construction of a new Culvert to include (but not limited to): a. Installation of precast concrete inverted slab, frames units and wingwalls. b. Construction of cast-in-place rein... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Orange Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Cement, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
