logo

Elmira WWTP Sludge Upgrades

Sector: Water Supply and Storage • Location: Elmira, Ontario, Canada

Source: Dodge USA

Project
Start

The work generally consists of a system used to offload biosolids (sludge) from Elmira Wastewater Treatment Plant (WWTP) onto tanker trucks. This project allows for sludge to be safely and effectively loaded into a tanker truck through a loading platform. The work includes process mechanical work for conveyance of the sludge, as well as SCADA and electrical upgrades to allow for truck operator to

Status
Under Construction
Sector
Water Supply and Storage, Road, Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial
Location
Elmira, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Elmira WWTP Sludge Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Elmira WWTP Sludge Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Elmira, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work generally consists of a system used to offload biosolids (sludge) from Elmira Wastewater Treatment Plant (WWTP) onto tanker trucks. This project allows for sludge to be safely and effectively loaded into a tanker truck through a loading platform. The work includes process mechanical work for conveyance of the sludge, as well as SCADA and electrical upgrades to allow for truck operator to see tank drawdown, pump selection, and valve open/close indication as well as communication with ...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Elmira

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project