logo

Elmwood South Reconstruction and Retention - Moncton

Sector: Water Supply and Storage • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Completed

Elmwood South Reconstruction and Retention project consists of street reconstruction of a section of Elmwood Drive and installation of a storm sewer basin that mitigates significant flood issues due to climate change. The Lewisville South neighbourhood is vulnerable to flooding due its low elevation. Additionally, this neighbourhood is located adjacent to Humphrey’s Creek, a tidal river which is i

Project Information FAQ

Project Information

4 Q
The project “Elmwood South Reconstruction and Retention - Moncton” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Elmwood South Reconstruction and Retention project consists of street reconstruction of a section of Elmwood Drive and installation of a storm sewer basin that mitigates significant flood issues due to climate change. The Lewisville South neighbourhood is vulnerable to flooding due its low elevation. Additionally, this neighbourhood is located adjacent to Humphrey’s Creek, a tidal river which is influenced by the Bay of Fundy tide cycles. The area was studied as part of a flood mitigation study completed in 2018. The scope of work includes but is not limited to the installation of a storm sewer relief system, a storm water detention basin and street reconstruction on a section of Elmwood Drive. The road reinstatement will cover approximately 380 metres of road infrastructure. These recommended improvements will reduce the risk of flooding in this neighbourhood. The estimated budget excludes the sanitary sewer renewal and watermain renewal component of the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data