logo

Elphinstone Bridge Railway Section Demolition and Reconstruction

Sector: Road • Location: Mumbai, Maharashtra, India

Source: Hindustan Times

Project
Under Construction

The demolition of the 112-year-old British-era Elphinstone Bridge's railway portion in Mumbai is set to begin on November 2, 2025, and is expected to be completed by January 2026. The bridge is being razed to make way for the Sewri-Worli Elevated Corridor, a key east-west connector. The project involves demolishing and rebuilding the section passing over the railway lines, with MRIDC responsible f

Project Information FAQ

Project Information

5 Q
The project “Elphinstone Bridge Railway Section Demolition and Reconstruction” is an infrastructure initiative in the Road sector, located in Mumbai, Maharashtra, India. Taiyo aggregates data on it from Hindustan Times.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The demolition of the 112-year-old British-era Elphinstone Bridge's railway portion in Mumbai is set to begin on November 2, 2025, and is expected to be completed by January 2026. The bridge is being razed to make way for the Sewri-Worli Elevated Corridor, a key east-west connector. The project involves demolishing and rebuilding the section passing over the railway lines, with MRIDC responsible for the work. The bridge will be replaced by a double-decker structure as part of the 4.5-km Sewri-Worli Elevated Corridor, featuring multiple lanes for vehicular traffic and pedestrian pathways. The railway section's reconstruction is estimated to cost ₹167.35 crore, while the overall corridor project is budgeted at ₹1,286 crore, with completion slated for December 2026.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data