Elphinstone Bridge Reconstruction
Under construction · Maharashtra · Last reported Sep 2025
Source: Curly Tales
The Elphinstone Road Over Bridge in central Mumbai, a crucial east-west link connecting Parel and Prabhadevi, was closed and demolished to make way for a new double-decker structure. Reconstruction work started on September 12, 2025, and is expected to continue for 60 days. The new bridge will have two levels, each with four lanes, improving connectivity between key roads and the Coastal Road.
- Status
- Under Construction
- Sector
- Road, Bridge
- Location
- Mumbai, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Curly Tales
ConstructChat
Ask ConstructChat about Elphinstone Bridge Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Elphinstone Road Over Bridge in central Mumbai, a crucial east-west link connecting Parel and Prabhadevi, was closed and demolished to make way for a new double-decker structure. Reconstruction work started on September 12, 2025, and is expected to continue for 60 days. The new bridge will have two levels, each with four lanes, improving connectivity between key roads and the Coastal Road. |
Original sector | Transport |
Location
Country | India |
State | Maharashtra |
City | Mumbai |
Source
Source | Curly Tales |
URL |
More Details
Record type | Project |
Sector | Road, Bridge |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
