Elphinstone Bridge Reconstruction
Planned · Maharashtra · Last reported Apr 2025
Source: ThePrint
The century-old Elphinstone Road Over Bridge in Mumbai will be closed for vehicular traffic starting April 25, 2025, as it is set to be demolished and reconstructed. This project is part of the Sewri-Worli Elevated Connector project by the Mumbai Metropolitan Region Development Authority (MMRDA).
- Status
- Prospective
- Sector
- Bridge, Road
- Location
- Mumbai, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- ThePrint
ConstructChat
Ask ConstructChat about Elphinstone Bridge Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The century-old Elphinstone Road Over Bridge in Mumbai will be closed for vehicular traffic starting April 25, 2025, as it is set to be demolished and reconstructed. This project is part of the Sewri-Worli Elevated Connector project by the Mumbai Metropolitan Region Development Authority (MMRDA). |
Location
Country | India |
State | Maharashtra |
City | Mumbai |
Source
Source | ThePrint |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2025-04-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
