logo

Elton Hills Dr. NW Lane Reduction and Resurfacing

Sector: Car parking • Location: Rochester, Minnesota, United States

Source: 106.9 KROC

Project
Planned

The project involves the Mill and Overlay resurfacing of Elton Hills Dr. NW in Rochester, MN, with a proposed lane reduction from four lanes to three lanes. The city conducted a traffic study to evaluate potential lane configurations and safety improvements. Three options were considered, including maintaining four lanes or reducing to three lanes with parking on both sides or with a bike lane on

Project Information FAQ

Project Information

3 Q
The project “Elton Hills Dr. NW Lane Reduction and Resurfacing” is an infrastructure initiative in the Car parking sector, located in Rochester, Minnesota, United States. Taiyo aggregates data on it from 106.9 KROC.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the Mill and Overlay resurfacing of Elton Hills Dr. NW in Rochester, MN, with a proposed lane reduction from four lanes to three lanes. The city conducted a traffic study to evaluate potential lane configurations and safety improvements. Three options were considered, including maintaining four lanes or reducing to three lanes with parking on both sides or with a bike lane on one side. The recommended option is the lane reduction with parking on both sides, which includes one lane for each direction and a center turn lane. The design process is scheduled to begin in August 2026 and continue until April 2027, with construction starting in May 2027.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data