Elwert Road Culvert Replacements
Pre-design · Oregon · Last reported May 2023
Source: Dodge USA
to replace the two culverts with reinforced concrete box culverts and widen the road at this location. This will improve stability of the road base and improve water flow and fish passage.
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Hillsboro, Oregon, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Elwert Road Culvert Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | to replace the two culverts with reinforced concrete box culverts and widen the road at this location. This will improve stability of the road base and improve water flow and fish passage. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Hillsboro |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2023-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
