logo
ProjectUnder Construction

ELYgator Electrolyzer Project

One of 5,541 projects Taiyo tracks in Netherlands.

Source: Air Liquide

Air Liquide is constructing a 200 MW electrolyzer in Maasvlakte, Port of Rotterdam, capable of producing 23,000 metric tons of renewable, low-carbon hydrogen annually. The project integrates two electrolyzer technologies, PEM developed with Siemens Energy and alkaline technology, to provide operational flexibility and stabilize the Dutch power grid. The project aims for industrial commissioning in

Status
Under Construction
Sector
Power Generation (CCGT), Hydrogen, Manufacturing (Industrial)
Location
Rotterdam, Netherlands
Updated
22 Jul 2026
Source
Air Liquide

ConstructChat

Ask ConstructChat about ELYgator Electrolyzer Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “ELYgator Electrolyzer Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Rotterdam, Netherlands. Taiyo aggregates data on it from Air Liquide.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Air Liquide is constructing a 200 MW electrolyzer in Maasvlakte, Port of Rotterdam, capable of producing 23,000 metric tons of renewable, low-carbon hydrogen annually. The project integrates two electrolyzer technologies, PEM developed with Siemens Energy and alkaline technology, to provide operational flexibility and stabilize the Dutch power grid. The project aims for industrial commissioning in late 2027 and supports decarbonization of regional industry and heavy-duty mobility.

Original sector

Energy Transition

Budget

Location

Country

Netherlands

City

Rotterdam

Source

Source

Air Liquide

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydrogen, Manufacturing (Industrial)

Article published date

2026-07-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project