Elysian at Skye Canyon
Sector: Car parking • Location: Las Vegas, Nevada, United States of America
Source: Dodge
Construction of nine (9) 3-story apartment buildings with a total of 315 units and 349,906 SF- 1-story Clubhouse (8970 SF) - Swimming pool & equipment house - Four (4) detached garage buildings
- Status
- Under Construction
- Sector
- Car parking, Commercial, Residential, Manufacturing (Industrial), Automotive
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Elysian at Skye Canyon
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of nine (9) 3-story apartment buildings with a total of 315 units and 349,906 SF- 1-story Clubhouse (8970 SF) - Swimming pool & equipment house - Four (4) detached garage buildings |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Residential, Manufacturing (Industrial), Automotive |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
