Elyson Basin E
Sector: Water Supply and Storage • Location: Houston, Texas, United States of America
Source: Dodge USA
Site Preparation, Detention Basin Excavation, off-site spoil disposal, on-site spoil disposal, drainage swales, (5) junction boxes and outfalls 171,171 CY of Detention Basin Excavation, and Spoil Disposal 3,754 LF of Backslope Interceptor Swale, and 10 Backslope Interceptor Structures 130 SY Concrete Slope Paving and 8 SY Concrete Rip-Rap 519 LF of 24-inch through 66-inch RCP and all appurtenances
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Elyson Basin E
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Site Preparation, Detention Basin Excavation, off-site spoil disposal, on-site spoil disposal, drainage swales, (5) junction boxes and outfalls 171,171 CY of Detention Basin Excavation, and Spoil Disposal 3,754 LF of Backslope Interceptor Swale, and 10 Backslope Interceptor Structures 130 SY Concrete Slope Paving and 8 SY Concrete Rip-Rap 519 LF of 24-inch through 66-inch RCP and all appurtenances 391 LF of 5'x4', 6'x5', and 9'x5' RCB open cut construction and all appurtenances Stormwater Pol... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
