Elyson Blvd Drive St Dedication & Sec 5 Utility Construction
Sector: Water Supply and Storage • Location: Katy, Texas, United States of America
Source: Dodge
- Approx. 2,125 LF of 8-inch through 12-inch water line and all appurtenances 2. Approx. 1,265 LF of 8-inch through 10-inch sanitary sewer pipe and all appurtenances 3. Approx. 1,180 LF of 24-inch through 60-inch storm sewer pipe and all appurtenances 4. Approx. 965 LF of 8 x5 and 10 x5 RCB and all appurtenances 5. Approx. 6,566 SY of 6-inch through 8-inch Subgrade Preparation 6. Approx. 5,770 SY
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Cement, Government, Power Transmission, Power Generation (CCGT), Commercial
- Location
- Katy, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Elyson Blvd Drive St Dedication & Sec 5 Utility Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Approx. 2,125 LF of 8-inch through 12-inch water line and all appurtenances 2. Approx. 1,265 LF of 8-inch through 10-inch sanitary sewer pipe and all appurtenances 3. Approx. 1,180 LF of 24-inch through 60-inch storm sewer pipe and all appurtenances 4. Approx. 965 LF of 8 x5 and 10 x5 RCB and all appurtenances 5. Approx. 6,566 SY of 6-inch through 8-inch Subgrade Preparation 6. Approx. 5,770 SY of 6-inch through 7-inch Reinforced Concrete Pavement 7. Approx. 4,310 LF of Reinforced Concrete... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Katy |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Cement, Government, Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
