logo
ProjectClosed

Elyson Phase 7 Overflow Mitigation Basins

Closed · Texas · Last reported Mar 2024

Source: Dodge USA

Site Preparation, Detention Basin/Channel Excavation, off-site spoil disposal, on-site spoil disposal, (2) junction boxes, (2) headwall with flared wings, box culverts, and outfalls 1,459,319 CY of Detention Basin/Channel Excavation, and Spoil Disposal 3,105 LF of Backslope Interceptor Swale, and 12 Backslope Interceptor Structures 375 SY Concrete Slope Paving and 2,164 SY Concrete Rip-Rap 1,684 L

Status
Closed
Sector
Commercial, Water Supply and Storage, Cement, Waste Processing and Treatment, Government
Location
Katy, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Elyson Phase 7 Overflow Mitigation Basins

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Elyson Phase 7 Overflow Mitigation Basins” is an infrastructure initiative in the Commercial sector, located in Katy, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Site Preparation, Detention Basin/Channel Excavation, off-site spoil disposal, on-site spoil disposal, (2) junction boxes, (2) headwall with flared wings, box culverts, and outfalls 1,459,319 CY of Detention Basin/Channel Excavation, and Spoil Disposal 3,105 LF of Backslope Interceptor Swale, and 12 Backslope Interceptor Structures 375 SY Concrete Slope Paving and 2,164 SY Concrete Rip-Rap 1,684 LF of 36-inch through 48-inch RCP trenchless/open cut construction and all appurtenances 455 LF of...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Katy

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Cement, Waste Processing and Treatment, Government

Article published date

2024-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project