Elyson Sec 62 Utilities and Reinforced Concrete Paving
Sector: Water Supply and Storage • Location: Houston, Texas, United States of America
Source: Dodge USA
Construction of Elyson, Section Sixty Two Water, Sanitary Sewer, Storm Sewer Facilities, and Reinforced Concrete Paving for Harris County MUD No. 532, Harris County, Texas 2,410 LF of 8-inch water line and all appurtenances 2,260 LF of 8-inch sanitary sewer pipe and all appurtenances 1,920 LF of 24-inch through 36-inch storm sewer pipe and all appurtenances 8,030 SY of 6-inch subgrade preparation
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Cement, Power Transmission, Car parking, Government, Waste Processing and Treatment, Residential, Power Generation (CCGT), Automotive, Commercial
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Elyson Sec 62 Utilities and Reinforced Concrete Paving
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of Elyson, Section Sixty Two Water, Sanitary Sewer, Storm Sewer Facilities, and Reinforced Concrete Paving for Harris County MUD No. 532, Harris County, Texas 2,410 LF of 8-inch water line and all appurtenances 2,260 LF of 8-inch sanitary sewer pipe and all appurtenances 1,920 LF of 24-inch through 36-inch storm sewer pipe and all appurtenances 8,030 SY of 6-inch subgrade preparation 7,530 SY of 6-inch reinforced concrete pavement 4,490 LF of reinforced concrete curb Lot Grading ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Cement, Power Transmission, Car parking, Government, Waste Processing and Treatment, Residential, Power Generation (CCGT), Automotive, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
