Embarcadero
Sector: Car parking • Location: CA, United States of America (USA)
Source: Anvil Builders
The project consisted of upgrades including the construction of new sewer junction structures along the Embarcadero, rehabilitation of approximately 240 linear feet via slip lining a 28-inch HDPE pipe underneath the Embarcadero and Jackson Street combined sewer discharge structure. Construction of a new valve and control vault including a 28-inch knife gate valve with hydraulic actuator sitting 23
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consisted of upgrades including the construction of new sewer junction structures along the Embarcadero, rehabilitation of approximately 240 linear feet via slip lining a 28-inch HDPE pipe underneath the Embarcadero and Jackson Street combined sewer discharge structure. Construction of a new valve and control vault including a 28-inch knife gate valve with hydraulic actuator sitting 23 feet below the existing sidewalk. The team that completed this project came across a handful of unknowns and many challenges. Some of these challenges were working with an extremely high-water table, unknown utilities, historical architectural structures, and the existing sewer to be slip lined was found out of alignment and surrounded by wood piles, sheet piles, concrete structures, and buried materials. The majority of unknown buried materials came from the 1989 earthquake that collapsed the elevated freeway above the now well-known Embarcadero. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Car parking projects in United States of America (USA)
- FM 1960 Access Management Study from East Gatewick to BF 1960A
- SH 249 Harris County - BW 8 to I-45 North
- FM 2818 (Harvey Mitchell Parkway) widening
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- US 59 - El Campo
- SH 36 from FM 2218 to FM 1495 - Brazoria County
- SH 6 Reconstruction - Gorman
- Memorial Drive from BW 8 to Tallowood Road
