EMCO Energy Limited

Sector: Water Supply and Storage • Location: India

Source: World Bank Group

Project
Active

EMCO Energy Limited was created to develop and operate the 600 MW coal merchant power plant developed in Warora Taluka of Chandrapur District in the state of Maharashtra. EMCO Energy Limited was a wholly owned subsidiary of GMR Energy Limited (GEL). GMR Energy Limited acquired EMCO Energy Limited from EMCO Ltd, the original developer in July 2009. The project was expected to be developed in two p

Project Information FAQ

Project Information

5 Q
The project “EMCO Energy Limited” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

EMCO Energy Limited was created to develop and operate the 600 MW coal merchant power plant developed in Warora Taluka of Chandrapur District in the state of Maharashtra. EMCO Energy Limited was a wholly owned subsidiary of GMR Energy Limited (GEL). GMR Energy Limited acquired EMCO Energy Limited from EMCO Ltd, the original developer in July 2009. The project was expected to be developed in two phases of 300MW each. In January 2009, EMCO Energy Limited had signed power purchase agreement with the Maharashtra State Electricity Distribution Company (MSEDCL) for 200 MW at INR 2.88/kWh. Under the terms of the agreement, the sponsor would supply power by 2013. The balance output of 400 MW was expected to be sold on merchant basis. It was reported that EMCO Energy Limited was in talks to sell 200 MW to MPPTC (Madhya Pradesh), 100 MW to GUVNL (Gujarat) and 20 MW to Western Railway constituents. In Jan 2009, Maharashtra, had finalized bids submitted by 3 generators - Adani Power, Indiabulls and Emco Energy for the supply of 2,850 Mw (under case-I bidding, a merchant power procurement process where the developers take full responsibility for project development including acquisition of land, availability of water and fuel linkages.). Indiabulls would supply 1,450 Mw at INR 3.26-3.42/kWh and Adani Power 1,200 Mw at INR 3.26/kWh. The estimated project cost was about USD 761 million (INR 34800 million at 48.41 INR/USD). Financial close took place in March 2010. Financing comprised USD 539.1 million (INR 26100 mn) 14-year and 6-month term loan in debt and USD 179.7 million (INR 8700 mn) in equity at a debt/equity ratio of 75/25. Axis Bank was the sole debt arranger and syndicator. Construction was expected to start during 2010. Land acquisition, evacuation plan and water allocation for both the phases were completed and the requisite approvals such as coal linkage and environmental clearance (MoEF) for phase-I (300 MW) were obtained. The order for Boiler-Turbine-Generator equipment was placed with SEC China. The fisrt plant was expected to be operational in August 2012 and the second one in November 2012. Unit-1 of 300MW was commissioned on 7th February 2013 and Unit-2 of 300MW was commissioned on 27th August 2013.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data