Emerald Energy From Waste Facility Expansion
Sector: Waste Processing and Treatment • Location: Brampton, Ontario, Canada
Source: The Pointer
The project involves the expansion of the Emerald Energy From Waste facility in Brampton, which will increase its waste incineration capacity from 182,000 to 900,000 tonnes per year. This expansion aims to make Brampton the largest waste-to-energy facility in Canada, despite significant opposition from environmental groups and health experts due to concerns over increased greenhouse gas emissions
- Status
- Closed
- Sector
- Waste Processing and Treatment
- Location
- Brampton, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- The Pointer
ConstructChat
Ask ConstructChat about Emerald Energy From Waste Facility Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the expansion of the Emerald Energy From Waste facility in Brampton, which will increase its waste incineration capacity from 182,000 to 900,000 tonnes per year. This expansion aims to make Brampton the largest waste-to-energy facility in Canada, despite significant opposition from environmental groups and health experts due to concerns over increased greenhouse gas emissions and public health risks. |
Original sector | Waste Management |
Location
Country | Canada |
State | Ontario |
City | Brampton |
Source
Source | The Pointer |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment |
Article published date | 2025-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
