logo
ProjectConstruction Documents

Emerald Logistics

Construction documents · Washington · Last reported Aug 2025

Source: Dodge

approx.192,844 square foot (SF) industrial, concrete tilt-up building with dock doors & associated semi-truck parking, vehicle parking, & drive aisles on an approx. 16.04-acre site. Assoc. construction includes lighting, landscaping, underground utilities (water, sewer, storm), stormwater vault & street frontage improvements along S. 287th St.

Status
Closed
Sector
Water Supply and Storage, Cement, Warehouse, Road, Power Transmission, Power Generation (CCGT), Automotive, Commercial, Car parking, Waste Processing and Treatment, Manufacturing (Industrial)
Location
Auburn, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Emerald Logistics

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Emerald Logistics” is an infrastructure initiative in the Water Supply and Storage sector, located in Auburn, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

construction documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

approx.192,844 square foot (SF) industrial, concrete tilt-up building with dock doors & associated semi-truck parking, vehicle parking, & drive aisles on an approx. 16.04-acre site. Assoc. construction includes lighting, landscaping, underground utilities (water, sewer, storm), stormwater vault & street frontage improvements along S. 287th St.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Auburn

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Warehouse, Road, Power Transmission, Power Generation (CCGT), Automotive, Commercial, Car parking, Waste Processing and Treatment, Manufacturing (Industrial)

Article published date

2025-08-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project