Emergency Farm Reconstruction Project
Sector: Water Supply and Storage • Location: Kosovo
Source: World Bank Group
The Emergency Farm Reconstruction Project aims at helping jumpstart agricultural production over the next two to three cropping seasons and to support re-launching of the rural economy by investing in key farm assets (cattle and farm mechanization) and key agricultural services (veterinary services, and policy analysis and formulation capacity). The project has five components: 1) The first compon
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Raw Materials, Government, Commercial
- Location
- Kosovo
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Emergency Farm Reconstruction Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Emergency Farm Reconstruction Project aims at helping jumpstart agricultural production over the next two to three cropping seasons and to support re-launching of the rural economy by investing in key farm assets (cattle and farm mechanization) and key agricultural services (veterinary services, and policy analysis and formulation capacity). The project has five components: 1) The first component will provide support to re-establishing the national cattle herd through the procurement of 2,300 cattle. 2) Rehabilitation of veterinary services will be implemented through the United Nations Food and Agriculture Organization (FAO) Project Management Team. Private veterinarians will be supported in equipment and drugs, and the support to public veterinary services will include the establishment of central and regional veterinary diagnostic laboratories, as well as a facility to ensure artificial insemination services. 3) Farm machinery repair and replacement will help rebuild the power capacity for agricultural production through a tractor repair program and the distribution of new equipment. 4) Agriculture policy capacity building will support the technical assistance of the Department of Agriculture in agriculture trade polices, and preparation for investments in irrigation rehabilitation in the near term. 5) Project management will support a team made up of local and international staff and will work closely with non-governmental organizations. |
Original sector | FY17 - Agriculture, Fishing and Forestry,Industry, Trade and Services |
Budget |
Location
Country | Kosovo |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Raw Materials, Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Kosovo
- Gjakova and Rahovec Water Supply
- WWTP MITROVICA
- WWTP GJILAN
- United Against Pollution
- Integrated Waste Management and Marine Litter Prevention
- Institutional Development "Network of Associations of Local Authorities of Southeast Europe" (NALAS)
- Adaptation to Climate Change in transboundary flood risk management in the Western Balkans
- Accursed mountains – exquisite outdoor destination
