Empire State Mines Kilbourne Graphite Project
Sector: Warehouse • Location: Gouverneur, New York, United States
Source: Watertown Daily Times
The project involves establishing a facility to process natural flake graphite discovered at the mine in 2023 into a powder suitable for applications requiring a finer product with reduced particle size. It is the first fully integrated U.S. graphite production operation since 1956 and aims to strengthen national security interests and supply chain resilience.
- Status
- Prospective
- Sector
- Warehouse, Power Generation (CCGT), Government
- Location
- Gouverneur, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Watertown Daily Times
ConstructChat
Ask ConstructChat about Empire State Mines Kilbourne Graphite Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves establishing a facility to process natural flake graphite discovered at the mine in 2023 into a powder suitable for applications requiring a finer product with reduced particle size. It is the first fully integrated U.S. graphite production operation since 1956 and aims to strengthen national security interests and supply chain resilience. |
Original sector | Mining |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Gouverneur |
Source
Source | Watertown Daily Times |
URL |
More Details
Record type | Project |
Sector | Warehouse, Power Generation (CCGT), Government |
Article published date | 2025-12-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
