logo
ProjectUnder Construction

Empire Wind 1 Cable Connection Project

Under construction · New York · Last reported Jul 2025

Source: Bloomberg

The project involves the Marmac 306, a US-flagged cable-laying barge, burying undersea cables to connect the Empire Wind 1 offshore wind farm to the Brooklyn power grid in New York City. The barge digs a trench for the cables that will transmit electricity generated by the $5 billion Empire Wind 1 project to the city grid, providing power to over 500,000 homes. The vessel was built in Louisiana by

Status
Under Construction
Sector
Raw Materials, Power Generation (CCGT), Wind, Seaport, Warehouse
Location
New York City, New York, United States of America
Updated
22 Jul 2026
Source
Bloomberg

ConstructChat

Ask ConstructChat about Empire Wind 1 Cable Connection Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Empire Wind 1 Cable Connection Project” is an infrastructure initiative in the Raw Materials sector, located in New York City, New York, United States. Taiyo aggregates data on it from Bloomberg.

Participants

Company

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the Marmac 306, a US-flagged cable-laying barge, burying undersea cables to connect the Empire Wind 1 offshore wind farm to the Brooklyn power grid in New York City. The barge digs a trench for the cables that will transmit electricity generated by the $5 billion Empire Wind 1 project to the city grid, providing power to over 500,000 homes. The vessel was built in Louisiana by Nexans SA and is operated by Crowley Maritime Corp.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

New York

City

New York City

Source

Source

Bloomberg

URL

More Details

Record type

Project

Sector

Raw Materials, Power Generation (CCGT), Wind, Seaport, Warehouse

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project