Empresa de Generación Eléctrica Canchayllo S.A.C.

Sector: Power Generation (CCGT) • Location: Peru

Source: Inter-American Development Bank (IADB)

Project
Repaid

Empresa de Generación Eléctrica Canchayllo S.A.C. (EGECSAC) was established in 2011 to generate and sell electricity.The purpose of this IIC project is to provide EGECSAC with financing to build and operate a hydroelectric plant with a generating capacity of 5.3 megawatts in Canchayllo District, Department of Junín, some 230 km from Lima. The plant will generate around 38 gigawatt hours of clean e

Project Information FAQ

Project Information

5 Q
The project “Empresa de Generación Eléctrica Canchayllo S.A.C.” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Peru. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaid

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Empresa de Generación Eléctrica Canchayllo S.A.C. (EGECSAC) was established in 2011 to generate and sell electricity.The purpose of this IIC project is to provide EGECSAC with financing to build and operate a hydroelectric plant with a generating capacity of 5.3 megawatts in Canchayllo District, Department of Junín, some 230 km from Lima. The plant will generate around 38 gigawatt hours of clean energy per year, with an average plant factor of 83%. Located on the Pachacayo River (a tributary of the Mantaro River), this plant will generate hydropower using run-of-the-river technology. It has a design flow of 7.0 m3 per second. The power will be transmitted to the National Electrical Grid System (SEIN) through a 22.9 kV transmission line extending 4 km.Construction is expected to take 23 months, beginning in October 2012 and ending in September 2014. The total cost of the project is US$10,286,000.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data