Empresa de Generacion Electrica de Junin
Sector: Hydro • Location: Peru
Source: World Bank Group
Empresa de Generacion Electrica de Junin, a partnership of Latin American Power and GCZ Energía, was awarded the contract to build and operate two small hydro power plant located at Comas, Concepcion (39.1 MW in capacity).
The power plants were named Runatullo II (19.1 MW) and Runatullo III (20 MW). Total investment committed to both power plants were estimated at US$ 89 million.
The concession
- Status
- Prospective
- Sector
- Hydro, Commercial, Power Generation (CCGT), Government
- Location
- Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Empresa de Generacion Electrica de Junin
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Empresa de Generacion Electrica de Junin, a partnership of Latin American Power and GCZ Energía, was awarded the contract to build and operate two small hydro power plant located at Comas, Concepcion (39.1 MW in capacity). The power plants were named Runatullo II (19.1 MW) and Runatullo III (20 MW). Total investment committed to both power plants were estimated at US$ 89 million. The concession contract signed in 2012 was established for a duration of 20 years plus the construction time. In July 2012, the project company applied for carbon credits. In May 2013, the project reached financial closure as it was granted a US$ 62 million loan from Grupo Credito, Interbank and Scotiabank. The remaining US$ 27 million was equity-financed. Commercial operations commenced in December 2014. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Peru |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Commercial, Power Generation (CCGT), Government |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
