logo

Empresa de Transmissao de Energia do Mato Grosso

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Active

In November 2009, Consorcio Alupar-Bimetal, a partnership of the Brazilian company Alupar/Alusa (60%) and of the brazilian company Bimetal Industria Metalurgica (40%), was awarded in a competitive bidding process the contract to build and operate a 235-km transmission line in the state of Mato Grosso (the line was set to connect the cities of Nova Mutum, Nobres and Cuiaba – Lote D). Besides Conso

Project Information FAQ

Project Information

4 Q
The project “Empresa de Transmissao de Energia do Mato Grosso” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In November 2009, Consorcio Alupar-Bimetal, a partnership of the Brazilian company Alupar/Alusa (60%) and of the brazilian company Bimetal Industria Metalurgica (40%), was awarded in a competitive bidding process the contract to build and operate a 235-km transmission line in the state of Mato Grosso (the line was set to connect the cities of Nova Mutum, Nobres and Cuiaba – Lote D). Besides Consorcio Alupar-Bimetal, only the state-owned company Eletronorte took part in all stages of the competitive bidding process. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. The winning bid was an offer of US$ 3.4 million (BRL 8.4 million) annual revenue (12.03% below the ceiling established by ANEEL). The contract was signed in June 2010, and the sponsors created the company Empresa de Transmissao de Energia do Mato Grosso (ETEM) to lead the project during the 30-year contract period. Information on the investment commitment was not available. The construction works commenced in early 2011 and concluded by December 2011. Also in December 2011, the state-owned bank BNDES granted a US$ 28.7 million (BRL 46.8 million) loan to the company.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data