Empresa de Transmissao de Energia do Mato Grosso
Active · Brazil
Source: World Bank Group
In November 2009, Consorcio Alupar-Bimetal, a partnership of the Brazilian company Alupar/Alusa (60%) and of the brazilian company Bimetal Industria Metalurgica (40%), was awarded in a competitive bidding process the contract to build and operate a 235-km transmission line in the state of Mato Grosso (the line was set to connect the cities of Nova Mutum, Nobres and Cuiaba – Lote D). Besides Conso
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Empresa de Transmissao de Energia do Mato Grosso
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In November 2009, Consorcio Alupar-Bimetal, a partnership of the Brazilian company Alupar/Alusa (60%) and of the brazilian company Bimetal Industria Metalurgica (40%), was awarded in a competitive bidding process the contract to build and operate a 235-km transmission line in the state of Mato Grosso (the line was set to connect the cities of Nova Mutum, Nobres and Cuiaba – Lote D). Besides Consorcio Alupar-Bimetal, only the state-owned company Eletronorte took part in all stages of the competitive bidding process. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. The winning bid was an offer of US$ 3.4 million (BRL 8.4 million) annual revenue (12.03% below the ceiling established by ANEEL). The contract was signed in June 2010, and the sponsors created the company Empresa de Transmissao de Energia do Mato Grosso (ETEM) to lead the project during the 30-year contract period. Information on the investment commitment was not available. The construction works commenced in early 2011 and concluded by December 2011. Also in December 2011, the state-owned bank BNDES granted a US$ 28.7 million (BRL 46.8 million) loan to the company. |
Original sector | Energy |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government |
Article published date | 2024-06-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
