logo

Empresa de Transmissao de Energia do Mato Grosso

Active · Brazil

Source: World Bank Group

Project
Active

In November 2009, Consorcio Alupar-Bimetal, a partnership of the Brazilian company Alupar/Alusa (60%) and of the brazilian company Bimetal Industria Metalurgica (40%), was awarded in a competitive bidding process the contract to build and operate a 235-km transmission line in the state of Mato Grosso (the line was set to connect the cities of Nova Mutum, Nobres and Cuiaba – Lote D). Besides Conso

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Empresa de Transmissao de Energia do Mato Grosso

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Empresa de Transmissao de Energia do Mato Grosso” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In November 2009, Consorcio Alupar-Bimetal, a partnership of the Brazilian company Alupar/Alusa (60%) and of the brazilian company Bimetal Industria Metalurgica (40%), was awarded in a competitive bidding process the contract to build and operate a 235-km transmission line in the state of Mato Grosso (the line was set to connect the cities of Nova Mutum, Nobres and Cuiaba – Lote D). Besides Consorcio Alupar-Bimetal, only the state-owned company Eletronorte took part in all stages of the competitive bidding process. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. The winning bid was an offer of US$ 3.4 million (BRL 8.4 million) annual revenue (12.03% below the ceiling established by ANEEL). The contract was signed in June 2010, and the sponsors created the company Empresa de Transmissao de Energia do Mato Grosso (ETEM) to lead the project during the 30-year contract period. Information on the investment commitment was not available. The construction works commenced in early 2011 and concluded by December 2011. Also in December 2011, the state-owned bank BNDES granted a US$ 28.7 million (BRL 46.8 million) loan to the company.

Original sector

Energy

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government

Article published date

2024-06-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project