In November 2006, Cia. Tecnica de Engenharia Eletrica (a subsidiary of the Brazilian company Alusa) was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 107- km transmission line located in the state of Espirito Santo (Mascarenhas – Verona). Besides Cia. Tecnica de Engenharia Eletrica, eleven other companies took part i

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
Espirito Santo, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Empresa de Transmissao do Espirito Santo

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Empresa de Transmissao do Espirito Santo” is an infrastructure initiative in the Commercial sector, located in Espirito Santo, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In November 2006, Cia. Tecnica de Engenharia Eletrica (a subsidiary of the Brazilian company Alusa) was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 107- km transmission line located in the state of Espirito Santo (Mascarenhas – Verona). Besides Cia. Tecnica de Engenharia Eletrica, eleven other companies took part in the contest: ESP - EMPRESA DE ENERGIA DE BOGOTA; CPFL ENERGIA; LINEAR PART. E INCORPORAÇÕES LTDA; CONSORCIO EDP – SCHAIN; CONTROL Y MONTAJES INDUSTRIALES; CONSÓRCIO EIP - P&B BRASIL; ABENGOA S.A.; ISA - INTERCONEXIÓN ELÉCTRICA S.A. E.S.P.; TERNA PARTICIPAÇÕES S.A.; CONSÓRCIO ESPIRITO SANTO; and ELECNOR S/A. The bidding criteria set by ANEEL was the lowest required annual revenue. Cia. Técnica de Engenharia Elétrica presented the lowest offer, a total value of US$ 2.17 million (BRL 4.75 million), 35.28% below the ceiling set by the regulatory agency. The contract was signed in April 2007, and the sponsors created the company Empresa de Transmissao do Espirito Santo S.A. to lead the project during the 30-year contract period. The sponsor committed US$ 31.7 million in the transmission line (BRL 58 million). Construction works commenced in April 2007, but financial closure was achieved in 2008, when the sponsor was granted a US$ 8.5 million (BRL 15.5 million) loan from Unibanco and a US$ 4.9 million (BRL 9 million) loan from Votorantim Bank. The remaining cost was set to be financed with the sponsors’ internal resources. Operation commenced in December 2008. In 2009, an additional investment of US$ 12.5 million (BRL 25 million) was channeled to the expansion of the Verona substation capacity. In May 2009, a US$ 13.85 million (BRL 27.7 million) loan was granted from the state-owned bank BNDES.

Original sector

Energy

Budget

Location

Country

Brazil

State

Espirito Santo

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2024-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project