logo

Empresa Generadora Haina

Sector: Oil and Gas • Location: San Cristóbal, Dominican Republic

Source: World Bank Group

Project
Active

A consortium led by Seabord was the only bidder for Empresa Generadora Haina. The consortium offered US$144.5 million for the 50% stake which Corde (Commission for the Reform of Public Enterprises) had valued at US$143-million. The proceeds of the bid were to be reinvested in the company to pay off liabilities and to increase capacity. At the time of the divestiture, Seabord included Enron Caribe,

Status
Prospective
Sector
Oil and Gas, Government, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial)
Location
San Cristóbal, Dominican Republic
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Empresa Generadora Haina

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Empresa Generadora Haina” is an infrastructure initiative in the Oil and Gas sector, located in San Cristóbal, Dominican Republic. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A consortium led by Seabord was the only bidder for Empresa Generadora Haina. The consortium offered US$144.5 million for the 50% stake which Corde (Commission for the Reform of Public Enterprises) had valued at US$143-million. The proceeds of the bid were to be reinvested in the company to pay off liabilities and to increase capacity. At the time of the divestiture, Seabord included Enron Caribe, Globeleq (the power sector subsidiary of the Commonwealth Development Corporation (UK)), Basic Energy and the Caribbean Basin Power Foundation. As of December 2008, EGE Haina was owned 50% by Haina Investment Company (a joint venture between Basic Energy [75.6%] and CAREC [24.4%]) and 50% by the government. Haina initially comprised five generating units with a total nameplate capacity of 363 MW. In January 2000, the private sponsors announced that an additional US$49.3 million was to be invested in the power plant. In 2001, Haina installed a US$150 million, 150 MW floating base load power barge and a 45.6 MW steam generator. In 2003, the company installed a 1.7 MW diesel power unit. As of December 2008, EGE Haina operated 11 generation units with a total combined capacity of 583 MW spread across six plants, namely San Pedro, Sultana del Este (power barge), Haina, Barahona, Puerto Plata and Pedernales. By mid 2003, the Dominican Republic was facing a power shortage. Distributors were not making power purchase payments because of the depreciation of the Dominican peso against the US dollar and the high price of oil. Haina claimed that distributors owed in excess of US$45 million, and as a result the generator was producing just 220-230MW, down from the peak of 540MW in March 2003. By end 2003, power production at Haina had been suspended and Haina was considering taking its plants out of operation unless the government cleared its debt with the company. By 2010, operations of EGE Haina's power plants were taking place normally. http://www.egehaina.com/

Original sector

Energy

Budget

Location

Country

Dominican Republic

State

San Cristóbal

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Oil and Gas, Government, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial)

Article published date

2024-05-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project