Empresa Norte de Transmissao de Energia SA (ENTE)

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Active

The transmission project comprises a 500 Kv transmission line connecting Tucurui, Maraba, and Acailandia substations. The total length of the line will be 469 KM. In addition to building and operating the transmission line, the project also comprises the construction of Acailandia substation and the expansion of the other substations involved.

The project will increase the interconnection betw

Project Information FAQ

Project Information

4 Q
The project “Empresa Norte de Transmissao de Energia SA (ENTE)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The transmission project comprises a 500 Kv transmission line connecting Tucurui, Maraba, and Acailandia substations. The total length of the line will be 469 KM. In addition to building and operating the transmission line, the project also comprises the construction of Acailandia substation and the expansion of the other substations involved. The project will increase the interconnection between the north and northeast regions. The project is the fourth connection circuit between Tucurui and Acailandia being part of a larger project linking the north and northeast substations. The third section of the north-northeast connection is under control of Empresa Amazonense de Transmissao de Energia (EATE), a consortium between Schanin and Alusa, with the state-owned company Electrobras. In this fourth section of the north-northeast interconnection, Electrobras is not part of the consortium. Initially the company responsible for the project, Empresa Norte de Transmissao de Enrgia S.A. (ENTE), was held by a consortium of Alusa and Schahin. By 2006, the project ownership was Alusa 50%, Cemig 18%, Brascan 18% and Montana-Dakota Utilities Company 14% ANEEL, the Brazilian independent regulatory agency for the electricity sector, offered through public bid the concession for the lines in August, 2002. Consorcio C4, composed by Schanin and Cia Tecnica de Engenharia Eletrica was the winner for offering the lowest price for an annual revenue in exchange for the electricity transmission services: US$24.5 million (R$72.9 million). The contract between ANEEL and ENTE was signed in December 2002 and it will be valid until December 2032. According to the contract, the lines were expected to become operational within 24 months of signature. The project reached financial closure in March 2004 when Brazil's Development Bank, BNDES, approved a financing package of US$106.7 million (R$296.7 million) for the project. The contract with BNDES was signed in July 2004 and operations commenced in October 2004. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data