logo

Empresa Regional de Transmissao de Energia S.A. (ERTE)

Active · Brazil

Source: World Bank Group

Project
Active

In August 2002, Consorcio SA Vila do Conde (a partnership of Schahin Engenharia Ltda and Alusa’s subsidiary Companhia Tecnica de Engenharia Eletrica) was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 155- km transmission line located in the state of Para (Vila do Conde-Santa Maria). Information on the other bidders was

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Empresa Regional de Transmissao de Energia S.A. (ERTE)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Empresa Regional de Transmissao de Energia S.A. (ERTE)” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In August 2002, Consorcio SA Vila do Conde (a partnership of Schahin Engenharia Ltda and Alusa’s subsidiary Companhia Tecnica de Engenharia Eletrica) was awarded in a competitive bidding process organized by the regulatory agency ANEEL the 30-year contract to build and operate a 155- km transmission line located in the state of Para (Vila do Conde-Santa Maria). Information on the other bidders was not available. The bidding criteria set by ANEEL was the lowest required annual revenue CONSÓRCIO SA - VILA DO CONDE presented the lowest offer, a total value of US$ 5.48 million (BRL 12.88 million), 0,10% below the ceiling set by the regulatory agency. The contract was signed in December 2002, and the sponsors created the company Empresa Regional de Transmissao de Energia S.A. (ERTE) to lead the project during the 30-year contract period. Over the years, the shareholding structure of ERTE changed and, as of 2009, the shareholders were Alusa (50,00%), state-owned Cemig (18,35%), American company MDU Resources International (13,30%) and Canadian company Brookfield (18,35%). The sponsor committed to invest US$ 26 million (BRL 80 million) in the transmission line. Financial closure was achieved in 2003, when the sponsor was granted a US$ 17.7 million (BRL 54.4 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. Operations commenced in September 2004.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government

Article published date

2024-05-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project