Empresa Santos Dumont de Energia

Sector: Commercial • Location: Minas Gerais, Brazil

Source: World Bank Group

Project
Active

In May 2009, the Brazilian company ETEP, a subsidiary of Alupar (fomerly known as Alusa), was awarded in a competitive bidding process the contract to build and operate the Santos Dumont Substation located at the state of Minas Gerais.

Besides ETEP, four other companies took part in the contest: ORTENG EQUIPAMENTOS E SISTEMAS LTDA.; the Brazilian consortium TRANSENERGIA (J.MALUCELLI, 25.5%; FURNA

Status
Prospective
Sector
Commercial, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)
Location
Minas Gerais, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Empresa Santos Dumont de Energia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Empresa Santos Dumont de Energia” is an infrastructure initiative in the Commercial sector, located in Minas Gerais, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In May 2009, the Brazilian company ETEP, a subsidiary of Alupar (fomerly known as Alusa), was awarded in a competitive bidding process the contract to build and operate the Santos Dumont Substation located at the state of Minas Gerais. Besides ETEP, four other companies took part in the contest: ORTENG EQUIPAMENTOS E SISTEMAS LTDA.; the Brazilian consortium TRANSENERGIA (J.MALUCELLI, 25.5%; FURNAS, 49%; and DELTA 25.5%); the Spanish company ELECNOR TRANSMISSAO DE ENERGIA LTDA; and the Brazilian company ATP ENGENHARIA LTDA. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Alupar presented the lowest offer, a total value of US$ 4.2 million (BRL 8.3 million), 23.1% below the ceiling set by the regulatory agency. The contract was signed in November 2009, and the sponsor created the company Empresa Santos Dumont de Energia (ESDE) to lead the project during the 30-year contract period. The sponsor committed to invest US$ 44.6 million (BRL 89.3 million) in the transmission line. Enviromental clearence was awarded in April 2011. Construction works commenced in May 2011 and were concluded by January 2013. In November 2012, the state-owned bank BNDES granted a US$ 21.9 million (BRL 42.8 million) to finance the construction works. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

State

Minas Gerais

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)

Article published date

2024-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project