ENABLING LARGE E-FLEETS PARTICIPATION IN POWER SYSTEMS OPTIMISATION THROUGH MASS DEPLOYMENT OF PEOPLE-FRIENDLY, LOW-COST INFRASTRUCTURE AND INTEROPERABLE VEHICLES
Ongoing · Belgium, United Kingdom, Finland, Austria, Slovenia, Cyprus
Source: EU Funding & Tenders Portal
Electric car markets have grown exponentially in recent years and the trend continued strongly through 2023. The EU has passed legislation to match its electrification ambitions, and more R&D projects are being funded to develop affordable user-centric EV concepts. Equally important is the sufficient coverage of charging infrastructure to achieve the optimal ratio of EVs per charger. The ePowerMov
- Status
- Under Construction
- Sector
- Electric Vehicles (EVs), Road, Commercial, Education, Automotive, Power Generation (CCGT)
- Location
- Belgium
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about ENABLING LARGE E-FLEETS PARTICIPATION IN POWER SYSTEMS OPTIMISATION THROUGH MASS DEPLOYMENT OF PEOPLE-FRIENDLY, LOW-COST INFRASTRUCTURE AND INTEROPERABLE VEHICLES
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ongoing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Electric car markets have grown exponentially in recent years and the trend continued strongly through 2023. The EU has passed legislation to match its electrification ambitions, and more R&D projects are being funded to develop affordable user-centric EV concepts. Equally important is the sufficient coverage of charging infrastructure to achieve the optimal ratio of EVs per charger. The ePowerMove concept is to develop a global energy-usage optimiser which brings together advanced technologies from charging infrastructure design and grid energy control, with a number of innovative and complementary elements to maximise the potential utilisation of individual innovations. All developments in the project are driven by social innovation, affordability and user acceptability, meeting users’ needs and requirements in socio-cultural contexts of different communities. The proposed slow charging solutions are cost-effective, bi-directional and interoperable, and intelligently synergised with the grid, to optimise the overall efficiency and capacity of power supply, mindful of increasing penetration of renewable energy systems. Solutions are demonstrated in Helsinki (Finland) with focus on charging infrastructure cost reduction and people-friendly applications, Klagenfurt (Austria) with focus on business model development and Nicosia (Cyprus) with focus on grid compatibility and energy flow optimisation. The multi-level systemic architecture is designed to be flexible, scalable, and compatible with a variety of regional power systems and V2G technologies. New business and usage models are explored to maximise the project results' impact, building up from a proven proliferation model developed in several EU-funded projects to assess policy intervention scenarios and strategies for mass-deployment EV uptake. ePowerMove will accelerate the transition to sustainable urban e-mobility and contribute to the reduction of greenhouse gas emissions in the global transport sector. |
Location
Country | Belgium |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Road, Commercial, Education, Automotive, Power Generation (CCGT) |
Article published date | 2025-10-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
